P18325: Team ABC's
/public/

Integrated System Build & Test

Table of Contents

Team Vision for Integrated System Build & Test Phase

Planned to do

What we did

Design Work

Mechanical

Basin Support System

Basin Support System

Basin Support Drawing

Basin Support Drawing

U.V Light Support

U.V Light Support

Hinge Drawing

Hinge Drawing

Latch Drawing

Latch Drawing

Rinsing Mechanism Decision Chart

Rinsing Mechanism Decision Chart

Nozzle Stand Assembly

Nozzle Stand Assembly

Nozzle Stand Ring (inches)

Nozzle Stand Ring (inches)

Nozzle Stand Foot (inches)

Nozzle Stand Foot (inches)

name10

name10

Electrical

Ultrasonic

Basin with Ultrasonic Transducer

Basin with Ultrasonic Transducer

Foil Test setup

Foil Test setup

Before piece of foil

Before piece of foil

After 5 minutes in ultrasonic bath

After 5 minutes in ultrasonic bath

UV

UV setup

UV setup

Controls

Power Distribution Board

Power Distribution Board

Electrical Enclosure Box

Box

Box

Box

Box

Bill of Materials

Bill of Materials

Plans for next phase

Team Plan:

Individual Plans:


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation