Team Vision for Subsystem Level Build & Test Phase
During this phase of the project, our team has planned to build the multiple subsystems. Those subsystems include on the electrical engineering side, the UV light sterilization and the ultrasonic transducer for the cleaning system. For the mechanical engineering side of the project, there is the water system, the basin and the drying system. Individually, these subsystems will be created and tested.Subsystem Build Results Summary
Mechanical
Electrical
The electrical components of the system are controlled via the Teensy LC microcontroller by a relay, which acts as a switch that is triggered by the Teensy. A breakout board for a relay was designed and constructed as a proof of concept as well as a test bed for the electrical systems.
Risk and Problem Tracking
- Updated Risk Management
Functional Demo Materials
Include links to:Plans for next phase
Team Plan:
Individual Plans:
- Angelo's 3-Week plan
- Kyla's 3-Week plan
- Christopher's 3-Week plan
- Yohance's 3-Week plan
- Jake's 3-Week plan
- Meg's 3-Week plan
- Rachel's 3-Week plan
Home | Planning & Execution | Imagine RIT
Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design
Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation