Table of Contents

Automated burger machine with custom imaging to reduce cost and attract customers

Team Vision for Build & Test Prep Phase

Planned Tasks

Completed Tasks

Test Plan Summary

PRI: Katie Berus

Rev: 1

Date: 01/23

Below is an example of our test plans. To see the entire document with all of our test plans click here.

Test Plan Cover

Test Plan Cover

Test Plan Printer

Test Plan Printer

Test Plan Printer Flow

Test Plan Printer Flow

Risk and Problem Tracking

Problem Tracking

Below is the current state of our problem tracking sheet as of 1/23/18. To see the full document click here.

Problem Tracking

Problem Tracking

Risk Assessment

PRI: Jacky Ho

Rev: 6

Date of Last Revision: 01/24/18

Risk List

Risk List

Risk Management Live Document: Risk List

Design Review Materials

Agenda

The finalized burger elevator part drawings have been modified to reflect the current assembly plan, including fasteners.

Burger Elevator Drawings and Assembly Documents

Part Number Quantity Planned Manufacturing Method Part Status Links to Part Drawing Document Owner
Top Plate R02 1 Machined Part Top Plate R02 Drawing Not Yet Fabricated Scott Eisele
Bottom Plate R02 1 Machined Part Bottom Plate R02 Drawing Not Yet Fabricated Scott Eisele
Side Plate R02 2 Machined Part Side Plate R02 Drawing Not Yet Fabricated Scott Eisele
Side Plate Slotted R02 2 Machined Part Side Plate Slotted R02 Drawing Not Yet Fabricated Scott Eisele
Front Bumper R02 2 Machined Part Front Bumper R02 Drawing Not Yet Fabricated Scott Eisele
Actuator Con Block R02 2 Machined Part Actuator Con Block R02 Drawing Not Yet Fabricated Scott Eisele
Cutoff Sensor Flag Type A R01 6 Machined Part Cutoff Sensor Flag Type A R01 Drawing Not Yet Fabricated Scott Eisele
Cutoff Sensor Flag Type B R01 6 Machined Part Cutoff Sensor Flag Type B R01 Drawing Not Yet Fabricated Scott Eisele
Pusher Baseplate R01 1 Machined Part Pusher Baseplate R01 Drawing Not Yet Fabricated Scott Eisele
Rail Con Bracket R01 2 3D Printed Rail Con Bracket R01 Model Not Yet Fabricated Scott Eisele
Cutoff Sensor Mount R01 2 3D Printed Cutoff Sensor Mount R01 Model Not Yet Fabricated Scott Eisele
Extruded Aluminum (16" Length) 4 Machined Part N/a Not Yet Fabricated Scott Eisele
Extruded Aluminum (12" Length) 2 Machined Part N/a Not Yet Fabricated Scott Eisele
Extruded Aluminum (4.5" Length) 5 Machined Part N/a Not Yet Fabricated Scott Eisele
Extruded Aluminum (1.5" Length) 1 Machined Part N/a Not Yet Fabricated Scott Eisele
Slotted Inside Corner Bracket 1 Machined Part N/a Not Yet Fabricated Scott Eisele
Inside Corner Bracket 4 Purchase Part N/a Acquired Scott Eisele
M3x10 Button Head Cap Screws 24 Purchase Part N/a N/a Scott Eisele
M3 Washers 24 Purchase Part N/a N/a Scott Eisele
1" Long UNC 8-32 Socket Head Cap Screws 20 Purchase Part N/a N/a Scott Eisele
1/2" Long UNC 8-32 Socket Head Cap Screws 32 Purchase Part N/a N/a Scott Eisele
8-32 Hex Nuts 16 Purchase Part N/a N/a Scott Eisele
#8 Washers 68 Purchase Part N/a N/a Scott Eisele
2" Long UNC 5/16"-18 Screws 12 Purchase Part N/a N/a Scott Eisele
3/4" Long UNC 5/16"-18 Screws 16 Purchase Part N/a N/a Scott Eisele
5/16"-18 Square Nuts 16 Purchase Part N/a N/a Scott Eisele
5/16"-18 Washers 16 Purchase Part N/a N/a Scott Eisele
Burger Elevator Assy R01 1 Assembly Drawing Burger Elevator R01 Assembly Drawing N/a Scott Eisele

Bill Of Materials

PRI: Jacky Ho

Rev: 4

Date: 01/24/18

Bill of Material (BOM)

Bun Etcher Bill of Materials

Bun Etcher Bill of Materials

Burger Cooker Bill of Materials

Burger Cooker Bill of Materials

Vacuum Transfer System Bill of Materials

Vacuum Transfer System Bill of Materials

Burger Assembler Bill of Materials

Burger Assembler Bill of Materials

General Items Bill of Materials

General Items Bill of Materials

Bill of Materials & Budget Live Document:

Bill of Materials & Budget Live Document

Plans for next phase

New Project Plan Documentation is designed to allow each team member to be in charge of their own tasks. Below is a snap shot of the plan and the entire document can be found here.

Project Plan MSD2

Project Plan MSD2

Below is an overview of some of the major tasks that need to be completed and the tentative due dates that have been attached to them. The items in read are considered Critical and need to be focused on getting completed on time.

MSD2 Gantt Chart

MSD2 Gantt Chart


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation