P18416: Belasenp Arborloo Base Manufacturing Process
/public/

Integrated System Build & Test

Table of Contents

Team Vision for Integrated System Build & Test Phase

Summarize:

Ongoing Test Results

Updated Test Plans.

Risk and Problem Tracking

Updated Risk Management.

Foam Coating Testing

Foam Coating Samples
Coating Test

Coating Test

Coating Test

Coating Test

Coating Test

Coating Test

Coating Test

Coating Test

Concrete Pouring Testing

Concrete Pouring Test

Concrete Pouring Test

Concrete Pouring Test

Concrete Pouring Test

Broken Ring

Broken Ring

Final Molds

Machining

Machining

Final Foam Molds
Ring

Ring

Ring

Ring

Ring

Ring

Seat

Seat

Assembly Plans

The assembly plans for the gravel/biochar sifter and the bottle stringing device can be found at the following links:

Sifter Table.

Stringer Bucket Assembly.

Concrete Testing

The concrete testing plans can be found at the following link.

.

Plans for Next Phase

The link to our Individual Visions can be found here.


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation