P18416: Belasenp Arborloo Base Manufacturing Process
/public/

Subsystem Build & Test

Table of Contents

Team Vision for Subsystem Level Build & Test Phase

Summary:

Prototyping

Green Foam Top Mold

Green Foam Top Mold

CNC - Green Foam

CNC - Green Foam

Pink Foam Mold

Pink Foam Mold

Sifter Testing

Sifter Testing

Sifter Testing 2

Sifter Testing 2

Concrete Testing

Concrete Samples

Concrete Samples

Concrete Testing Machine

Concrete Testing Machine

Final Concrete Samples

Final Concrete Samples

Design Package

Foam Mold 1

Foam Mold 1

Foam Mold 2

Foam Mold 2

Foam Mold 3

Foam Mold 3

Foam Mold 4

Foam Mold 4

Foam Mold 5

Foam Mold 5

Vacuum Formed Mold 1

Vacuum Formed Mold 1

Vacuum Formed Mold 2

Vacuum Formed Mold 2

Vacuum Formed Mold 3

Vacuum Formed Mold 3

Vacuum Formed Mold 4

Vacuum Formed Mold 4

Vacuum Formed Mold 5

Vacuum Formed Mold 5

Vacuum Formed Mold 6

Vacuum Formed Mold 6

Vacuum Formed Mold 7

Vacuum Formed Mold 7

Sifter - SolidWorks Model

Sifter - SolidWorks Model

Sifter Assembly and BoM

Sifter Assembly and BoM

Sifter Top Assembly

Sifter Top Assembly

Sifter Parts

Sifter Parts

Stringer - SolidWorks Model

Stringer - SolidWorks Model

Stringer - SolidWorks Model

Stringer - SolidWorks Model

Stringer - SolidWorks Model

Stringer - SolidWorks Model

Please view our complete Design Package for further details.

Results

Large Gravel Pieces - Post-Sifter

Large Gravel Pieces - Post-Sifter

Ideal Sized Gravel Pieces - Post-Sifter

Ideal Sized Gravel Pieces - Post-Sifter

Risk and Problem Tracking

Test Plans

Materials Testing

Plans for Next Phase

Please see our | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation