Team Vision for Final Demo and Handoff

During this phase, the team planned to implement aeroponics into the Surculus and validate the system. The team did successfully finish assembling the Surculus and begin testing. Aside from building and testing, the team created a poster for Imagine RIT, wrote the technical for the project, and prepared a lightning talk.

Testing Summary

Aeroponics

Aeroponics Pre-Assembly

Aeroponics Pre-Assembly

Brackets

Bracket

Bracket

Bracket Cover

Bracket Cover

Plants

Plant Growth Progress

Plant Growth Progress

The Surculus

Improvements

Original Surculus vs Improved Surculus

Original Surculus vs Improved Surculus

Alternations made to the Surculus:

Finished Surculus

Working Surculus

Working Surculus

Performance vs Requirements

Customer Requirements

Customer Requirements

Customer Requirements

Engineering Requirements

Engineering Requirements

Engineering Requirements

Engineering & Customer Comparison

Engineering vs Customer Requirements

Engineering vs Customer Requirements

Requirement Test Results

Performance vs Requirements

Performance vs Requirements

The comprehensive document including the customer reqs, engineering reqs, performance, and test procedures can be found here

Risk and Problem Tracking

Final Risk Assessment Visual

Final Risk Assessment Visual

Above is the finalized Risk Management. It represents the history of the risk for the project. It was is important to note that all risks have been mitigated at this time. The document can be found here.

Problem Tracking Visual

Problem Tracking Visual

A link to the final Problem Tracking can be found here.

BOM & Final Budget

Final BOM

Final BOM

Final BOM (Cont.)

Final BOM (Cont.)

Final Budget Summary

Final Budget Summary

Overall, we spent $1260.65 out of the total budget of $1600. We did not make any new purchases since the last design review, and focused on building and running the Surculus.

Final Project Documentation

Technical Paper and Poster

You will find the Technical Paper and the Project Poster at the following links:

Technical Paper

Project Poster

Work Breakdown: By Topic

Project Management Design Tools Design Documentation Implementation Validation Presentation & Dissemination

PRP

Requirements

Action Item List

Budget Analysis

Risk Management

Problem Tracking

Benchmarking

Functional Decomposition

Morphological Chart

Pugh Chart

BOM

Mechanical Drawings

Electrical Schematic

Test Plans

Test Benches Image

Data Collection 1

Data Collection 2

Simulations

Surculus Test Results

Technical Paper

Poster

Imagine RIT

Recommendations

Future Work Recommendations…
  1. Current motor should be replaced with a superior motor and gear design. A variable speed motor would allow more control over the system.
  2. Update the electrical box. The old electrical box’s safety was unknown and its appearance is janky.
  3. Implement a sensor system to measure and document the changes in the environment.
  4. Continue testing with varying lighting setting (exposure time and wattage) to discover the optimum settings for the eco-friendly system.
  5. Varying pump strength to control water flow

Action Shot

Charlie and gang killing the game

Charlie and gang killing the game

Plans for Wrap-up

The Clean Up Plan is the plan we intend to follow after Imagine RIT in order to get the Surculus back to Harbec in a timely manner.

Individual Wrap-up Plans:

The team also plans to give Bob a binder with information about project. Content of the binder includes the following:

Action Items for Gate Review


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation