Team Vision for Detailed Design Phase

Team Accomplishments

Improvement Areas

Progress Report

Updated Budget Overview

Updated Budget Overview

Test Bench Assembly Progress:

Test Bench Update

Test Bench Update

Detailed Progress Report can be viewed here

Subsystem Analysis

LED Subsystems

1. In lighting selection, the parameters that were used

2. Final Design choices

3. Dimming capability

4. Timer

Light Temperature

Light Temperature

Preliminary Electrical Schematic

Preliminary Electrical Schematic

Links to LED subsystem analysis can be found here.

Sensor Subsystem

1. Why have a Sensor System?

2. Senors of interest

3. Type of sensor system

Proposed Device

Proposed Device

Links to Sensor subsystem analysis can be found here.

Aeroponics Subsystem

Aeroponics

Advantages

Disadvantages

Water Pump

PVC Piping

Misting Nozzle

Aeroponics subsystem analysis can be found here.

Preliminary Water Delivery Overview

Preliminary Water Delivery Overview

Preliminary Water Delivery Schematic

Preliminary Water Delivery Schematic

Preliminary Water Delivery Detail

Preliminary Water Delivery Detail

Bill of Material (BOM)

Updated BOM

Updated BOM

Purchase History

Purchase History

Links to the updated BOM as well our purchase history to date can be found here and here respectively.

Engineering Requirements

Engineering Requirements with Testing

Engineering Requirements with Testing

A link to the updated engineering requirements can be found here

Test Plans

Experiment Design

Experiment Design

Benchtop Experiment-

System Experiment-

Test plans document can be found here

Minitab DOE Output

Minitab DOE

Minitab DOE

Minitab DOE setup can be found here

Design and Flowcharts

Tray Option 1 - Modified Surculus Tray:

More details and full sketch can be found here

Tray Design 1

Tray Design 1

Tray Design 1

Tray Design 1

Tray Option 2 - Modified Surculus Tray:

More details and full sketch can be found here

Tray Design 2

Tray Design 2

Tray Design 2

Tray Design 2

Tray Option 3 - Ideal Tray:

More details and full sketch can be found here

Tray Design 3

Tray Design 3

Tray Design 3

Tray Design 3

Risk Assessment

Risk Assessment Visual

Risk Assessment Visual

The working document for the Risk Assessment can be found here

Plans for MSD II

MSD I Follow-up Items and MSD II Milestones

The PDF of the project schedule can be found here

Individual 3 Week Plans

Mike's 3 Week Plan

Erin's 3 Week Plan

Gi's 3 Week Plan

Gabe's 3 Week Plan

Josh's 3 Week Plan

Katie's 3 Week Plan

Issues & Concerns

Action Items

Notes from Detailed Design Review including action items can be found here

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation