Team Vision for System-Level Design Phase

The main objective in this phase of our project is to design the structure of our system. We plan to decide on a layout both mechanically and electrically while also beginning the decision making process for some components such as water pumps, pipes, micro-controllers, and sensors. In addition, we plan to perform basic cost-benefit analysis when considering some of the preliminary components we know that we will use. We plan to begin to collect materials for a small scale prototype of the system as well that we will use to test our monitoring system sensors as well as discover any unseen issues with the architecture of the system as well.

Goals:

Functional Decomposition

Functional Decomposition

Functional Decomposition

The Functional Decomposition document can be found here

Engineering Requirement

Engineering Requirements

Engineering Requirements

The Engineering Requirement document can be found here

Benchmarking

Mechanical System Benchmarking

Mechanical System Benchmarking

Concept Development

Hydroponic System

Frame

Mechanical System Pugh Chart

Mechanical System Pugh Chart

Piping

Mechanical System Pugh Chart

Mechanical System Pugh Chart

Protection

Mechanical System Pugh Chart

Mechanical System Pugh Chart

Monitoring System

Microcontroller Pugh Chart

Microcontroller Pugh Chart

The Pugh Chart document can be found here

Feasibility: Prototyping, Analysis, Simulation

Analysis

Analysis

Cost Analysis

Preliminary Cost Analysis

Preliminary Cost Analysis

Morphological Chart and Concept Selection

Morphological Chart

Morphological Chart

The Morphological chart document can be found here

Concept Selection

Selection Criteria

Systems Architecture

System Architecture

System Architecture

Designs and Flowcharts

A-Frame Design

A-Frame

A-Frame

Flow Chart

Monitoring System Hydroponic System
public/Photo Gallery/uc_flowchart.png public/Photo Gallery/mechanical_flowchart.jpg

Risk Assessment

Risk Management

Risk Management

The Risk Management document can be found here

Design Review Materials

Plans for next phase

Team Member Activities
Nate
  • Help with testing homemade conductivity sensor
  • Housing for electrical components (chassis for power box)
  • Power conversion
Ryan
  • Assist with the construction of the prototype system
  • Build CAD models for the design
Kevin
  • Buy supplies for prototype build
  • Begin construction on prototype
  • Begin refining mechanical engineering drawings (CAD)
  • Calculate size for air pump
Ray
  • Purchase a cable for testing conductivity sensor implementation
  • Work with purchase coordinator to finalize a list of sensors and equipments for sensor implementation.
Thierno
  • Focus on subsystem electrical design
  • Wiring diagram and connection
Jerry
  • Finalize BOMs
  • Create Wiring diagram for the microcontroller
  • Create pseudo-code for microcontroller
Gannt Chart for Next Phase: Gannt Chart

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation