Team Vision for Preliminary Detailed Design Phase

During this phase the goals of the team were to work on drafting a design for the stringing operation as well as the rope operation. From this we have created a draft BOM that will help us in the creation of a budget, lead time, and vendors. A cost analysis was completed to ensure that the product we are producing is going to at the minimum break even. Finally the team also research ergonomic estimates to ensure that we are not going to cause harm to the users. Also sufficent work was done on creation of test plans for all engineering requirements as well as beginning of prototype testing.

Feasibility: Prototyping, Analysis, Simulation

Testing Feasibility of Reshaping the Bottles by Hand

Reshaping Bottles

Reshaping Bottles




















Testing Design #1

Testing Design 1

Testing Design 1

Testing Twisting the Strings Individually

Testing Twisting String Individually by hand

Testing Twisting String Individually by hand

Testing Twisting String Individually by drill

Testing Twisting String Individually by drill

Drawings, Schematics, Flow Charts, Simulations

Twisting Assembly

Twisting Assembly

Spool

Spool

Stringing Assembly

Stringing Assembly

Bill of Materials (BOM)

BOM

BOM

Our BOM Excel document can be found here.

Test Plans

All of our test plans can be found here.

Design and Flowcharts

You can access this document here as an excel version or here for the visio version.
Process Flow Diagram Updated

Process Flow Diagram Updated

Ergonomic Calculations

Risk Assessment

Risk Assessment

Risk Assessment

Design Review Materials

Plans for next phase


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation