P18434: Nicaragua Bottle Upcycling Business Development
/public/

Gate Reviews

Table of Contents

MSD I: Readiness to move to Build & Test

Status Review

Current state of the project

Deliverables Checklist and Website Status

Deliverable Description
Process
  • All operations defined with details, duration, and work instruction
  • Drawings, specs, and work instruction for tools / equipment
  • Perform time study when possible to estimate task duration
  • Balance the line
  • Cost of labor, equipment, facility, consumable, and utility
Facility Layout
  • Number of stations
  • Equipment locations
  • Visual Control
Simulation
  • Build a Simio model for the process
  • Validate process time
  • Validate facility layout and balanced line
  • Estimate average throughput
Supply Chain
  • Identify customers and suppliers
  • Identify the estimated lead time for the facility
  • Propose the transportation method
Quality Control
  • Quality Procedure
  • 5S Plan
  • Total Productive Maintenance
Business Model
  • Collaboration effort with a student from the Saunders College of Business. The model developed will help the customers to define their business logic at the strategic level.
  • NOTE: the deliverance of the business model depends on whether or not our team can obtain an assigned business student.
MSD Deliverable
  • Technical Paper
  • Project Poster
  • Full Functional Demonstration
  • Imagine RIT

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation