Integrated System Build & Test

Table of Contents

Team Vision for Integrated System Build & Test Phase

Procurement:

Test Plans:

System Design:

Risk /Problem Analysis and Tracking (update):

Project Plan (update):

Test Results Summary

WD-40

WD-40

WD-40 test on glue on plastic bottle

WD-40 test on glue on plastic bottle

Bottle puncture test with hooked blade

Bottle puncture test with hooked blade

Bingo cage drying test

Bingo cage drying test

Label removal via heat gun test

Label removal via heat gun test

Wiping off glue on bottle with WD-40 on a paper towel

Wiping off glue on bottle with WD-40 on a paper towel

Bottle cutting time trials data

Bottle cutting time trials data

Heat gun time trials data

Heat gun time trials data

Glue removal time trials data

Glue removal time trials data

Process times

Process times

A link to the working Time Tests document can be found here

Data for Yamazumi chart

Data for Yamazumi chart

Yamazumi chart

Yamazumi chart

A link to the working Process Times and Yamazumi Chart document can be found here

Simio model 1

Simio model 1

Simio model 2

Simio model 2

A link to the working Simio Model document can be found here

Updated Bill of Materials

Updated Bill of Materials

A link to the working Bill of Materials document can be found here

Updated work instructions

Updated work instructions

Risk and Problem Tracking

Updated problem management 1

Updated problem management 1

Updated problem management 2

Updated problem management 2

A link to the working Problem Management document can be found here

Updated risks

Updated risks

Updated risk chart

Updated risk chart

A link to the working Risk Management document can be found here

Presentation

The presentation for this phase can be found here

Plans for next phase

Phase 7 Plan

Phase 7 Plan

Phase 7 Plan cont.

Phase 7 Plan cont.


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation