P18453: Centrifugal Compressor: Design and Commissioning
/public/

Preliminary Detailed Design

Table of Contents

Team Vision for Preliminary Detailed Design Phase

Team Agenda

Team Accomplishments

Prototyping, Engineering Analysis, Simulation

Iterative activities to demonstrate feasibility, including assumptions you made in your analyses or simulations. Have you completed sufficient analysis to ensure that your design will satisfy requirements? Have you included all usage scenarios in your modeling?

Feasibility: Prototyping, Analysis, Simulation

Feasibility Model

Feasibility Model

Feasibility Governing Equations

Feasibility Governing Equations

Drawings, Schematics, Flow Charts, Simulations

A tensioner must be used to ensure belt does not slip. Below is a mock up of the initial concept.

Tensioner Concept

Tensioner Concept

Bill of Material (BOM)

Bill of Materials

Bill of Materials

Link to the live document here

Test Plans

Purpose

Demonstrate objectively the degree to which the Engineering Requirements are satisfied

Instructions

  1. Complete test plans specifying the data to be collected, instrumentation to be used, testing procedures and personnel who will conduct the tests.
  2. Plans should use data collected to define the accuracy of models generated during feasibility analysis.
  3. If your team's testing will involve human subjects, you must review the RIT Human Subjects Research Office "Protecting Human Subjects" page for details on securing approval for work with human subjects

Inputs and Source

  1. Engineering Requirements
  2. Feasibility Models
  3. Test standards (e.g., ASTM). The RIT library maintains an infoguide with links to standards databases, many of which provide industry-standard test procedures for a variety of components and systems.

Outputs and Destination

  1. Report that summarized the degree to which Eng Reqs are satisfied.
  2. Assessment of accuracy of feasibility models.
  3. IRB Submission, if applicable (allow at least 30 days for this to be reviewed - more time is idea, since the IRB outcome may be a request for you to modify your proposed test protocol)

Design and Flowcharts

This section should continue to be updated from your systems level design documentation.

Risk Assessment

Design Review Materials

Include links to:

It is appropriate for you to send your customer and guide a link to this page in preparation for the review. This will ensure that they know what you will be presenting and how to view all of your work. Any EDGE link should start with http://edge.rit.edu/edge/P1xxxx..... Using "http" instead of "https" will ensure that non-RIT stakeholders can view the content without being prompted for a DCE login and password.

Plans for next phase

Three Week Plan

Three Week Plan

Three Week Plan

Three Week Plan

Link to the live document here


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation