P18453: Centrifugal Compressor: Design and Commissioning
/public/

Subsystem Build & Test

Table of Contents

Team Vision for Subsystem Level Build & Test Phase

Planned:

Accomplished:

Test Results Summary

Instructions

  1. Quantitatively summarize the capabilities, performance, throughput, and robustness of your subsystems as demonstrated by execution of the text plan. Document your testing with photos or videos in addition to test data.
  2. Evaluate how well the test plan was able to confirm satisfaction of subsystem requirements
  3. Include snapshot of testing completed to date, and include link to live requirements and testing document

Inputs & Source

  1. Test Plan
  2. Subsystem fabrication

Outputs & Destination

  1. Test Results
  2. System integration

Risk and Problem Tracking

Functional Demo Materials

Include links to:

Updated BOM

Test Plan Example

Test Plan Example

Link to the live document here

Plans for next phase


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation