P18461: Solar Powered UV Water Purification
/public/

Integrated System Build & Test

Table of Contents

Team Vision for Integrated System Build & Test Phase

Summarize:

Gantt Chart

Budget Increase

Test Results Summary

Microbiological Testing

Attached Here is an in depth explanation of the methodology that will be used for the microbiological testing.

Pump Testing

Power System Testing

Risk and Problem Tracking

One of our risks was not meeting our allotted budget. We exceeded our budget and needed to request an additional $250 to our original budget of $500. Purchase details are noted in the updated Budget Increase

Functional Demo Materials

Mechanical

Updated System Model
Prototype of system casing

Prototype of system casing

Electrical

Processor for Solenoid Valve Operation. Red and Green LEDs are being used to develop the logic for the control states of the Solenoids.

Processor for Solenoid Valve Operation. Red and Green LEDs are being used to develop the logic for the control states of the Solenoids.

Voltage Regulator

Voltage Regulator

Plans for next phase

Phil's Three Week Plan

Ryan's Three Week Plan

Alex's Three Week Plan

Erik's Three Week Plan

Aaron's Three Week Plan

Graham's Three Week Plan

Justin's Three Week Plan


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation