P18711: MSD Team Assignment Process Improvement
/public/

Subsystem Build & Test

Table of Contents

Team Vision for Subsystem Level Build & Test Phase

PRP Updates

PRP Documentation Flow

PRP Documentation Flow

PRP Documentation Requirements

PRP Documentation Requirements

Changes Made to the PRP

Changes Made to the PRP

PRP Google Form

PRP Google Form

PRP Google Form

PRP Google Form

PRP Google Form

PRP Google Form

PRP Google Form

PRP Google Form

PRP Google Form

PRP Google Form

PRP Google Form

PRP Google Form

PRP Google Form

PRP Google Form

PRP Word Template

PRP Word Template

PRP Word Template

PRP Word Template

PRP Word Template

PRP Word Template

PRP Word Template

PRP Word Template

Test Results Summary

Engineering Requirements

Engineering Requirements

Key

Key

Risk and Problem Tracking

An updated list of Risks can be found on the Planning & Execution page. There was one risk added this phase that deals with the robustness of the system for use in future semesters. The team is concerned with the ease of changing formulas in Excel and Python to incorporate changing requirements. The training documentation will be thoroughly detailed to where changes to current settings can be changed, but cannot incorporate additions that are not currently being used. The team's contacts will be included in documentation to be used if necessary in future years.

The overall risk score over the phases of MSD I and MSD II is plotted below.

Risk Score Over Time

Risk Score Over Time

Functional Demo Materials

Meeting Information

Meeting Date 2/28/18 1:15-1:30PM

Location: GLE 4425 Senior Design Floor

Attendees: Beth DeBartolo, Chris Fisher, John Kaemmerlen, Varun Sharma, Ed Hanzlik, Sarah Brownell, Kyla Driver

Agenda:

Meeting Notes: to be recorded in the team's OneNote documents

Slide Deck: to be uploaded after meeting

Plans for next phase


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation