P18718: ISE Utility Infielders
/public/

Integrated System Build & Test

Table of Contents

Team Vision for Integrated System Build & Test Phase

This project was defined as a 3 phase project by the team and guide, given the nature of the project and the fact that we were doing it for one semester only. We met with our guide at least once a week to do short interim reviews. So some of the work normally associated with this phase was actually done in the previous or following phase.

Test Results Summary

Results from the survey can be seen in 'Presentation 2' in the 'Customer Handoff & Final Project Documentation' section of this website. Also, there is a summary of the performance vs. the engineering requirements as of the end of the project.

Instructions

The proposed layouts from this data collection, as well as the analysis can be found in 'Presentation 3' in the 'Customer Handoff & Final Project Documentation' section of this website.

Inputs & Source

Outputs & Destination

Risk and Problem Tracking

Functional Demo Materials

Plans for next phase


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation