Problem Definition

Table of Contents

Team Vision for Problem Definition Phase

During this phase the team planned to:

During this phase the team actually:

Project Statement

A materials flow system encompases the flow of material from the time they enter the warehouse until the time they leave. It should define smooth flow of material and allow for parts tracking throughout the system. Additionally, all processes should be standard and well documented to allow for simple operator execution. Currently, L3 has little standardization, no process documentation, and no process for continuous improvement in their front end processes.

The objectives of this project are to analyze the current state of the front end processes and create a future state with defined material flow. Within the future state there will be documented standard work and procedures for continuous improvement events with employee involvement. Additionally, a full warehouse management system will be investigated. The system must work with Wisys (the current system at L3). The overall goal of this project is to improve cycle time and on-time delivery metrics from their baseline levels. The expected result is a working prototype of the materials flow process, including all process documentation, that can be handed off to the L3 team. In addition, a plan for the warehouse management system will be created to be handed off to the IT department.

Use Cases

The use cases are defined by the following Use Cases Matrix

Use Cases Matrix

Use Cases Matrix

The working document for the Use Case Matrix can be found here

Project Goals and Key Deliverables

See Project Statement

Customer Requirements (Needs)

The Customer Requirements identified are shown in the following Customer Requirements Matrix

Customer Requirements Table

Customer Requirements Table

The working document for the Customer Requirements can be found here

Engineering Requirements (Metrics & Specifications)

Engineering Requirements Table

Engineering Requirements Table

The working document for the Engineering Requirements can be found here

Constraints

The created system must be functional with Wisys.

House of Quality

House of Quality

House of Quality

The working document for the House of Quality can be found here

Risks

Risks

Risks

The working document for the Risk Table can be found here

Design Review Materials

The presentation for the design review on September 18, 2017 can be found here

Plans for next phase

Project Plan - Phase 1

Project Plan - Phase 1

Project Plan - Phase 2

Project Plan - Phase 2

The working document for the Project Plan can be found here

Leigh's Individual Plan for Phase 2

Chris' Individual Plan for Phase 2

Brandon's Individual Plan for Phase 2

Jess' Individual Plan for Phase 2

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation