P19001: Wearable Interface
/public/

Integrated System Build & Test

Table of Contents

Team Vision for Integrated System Build & Test Phase

Current Phase Plan Progress

Order PCB

Start Tests

Integrate Sleep Mode into Dext

Complete Game

Finish wearable mechanical prototype for testing

Start a Software Manual for the Dext

Report Battery Level to Device

Add Connection Security (Password)

DEXT

DEXT

DEXT Prototype Progress

A Software manual Outline has been started and progress will be started in Tandem with the Poster for the DEXT.

An issue has arisen where our scope is severely limited by what is supported on the board. Security measures such as passwords are not supported.Ultimately this feature could not be implemented and future iterations may need to switch boards, again.

Game Progress

Mechanical Prototype Progress

This issue has been noted in Problem Tracking as this is a very key feature for Many of the necessary Tests. That said progress has been made in understanding how it should be constructed in the future.

Test Results Summary

Test Completed? Current Status? Within Current Scope?
S1 - Communication Delay Complete Testing and Data gathered, waiting on conclusion Within Current Iter Scope
S2 - Battery Life Not Started Waiting on Wearable Prototype Within Current Iter Scope
S3 - Recharge Rate Not Started Waiting on Wearable Prototype Within Current Iter Scope
S4 - Weight Not Started Waiting on Wearable Prototype Within Current Iter Scope
S5 - Vertical Profile Not Started Waiting on Wearable Prototype Within Current Iter Scope
S6 - Adjustability Not Started Waiting on Wearable Prototype Within Current Iter Scope
S7 - Comfort Not Started Waiting on Wearable Prototype Within Current Iter Scope
S8 - # of Possible Controls Not Started Waiting on Wearable Prototype Within Current Iter Scope
S9 - Durability Not Started Waiting on Wearable Prototype Within Current Iter Scope
S10 - Removal / Equip time Not Started Waiting on Wearable Prototype Within Current Iter Scope
S11 - Cycle Testing Not Started Waiting on Wearable Prototype Possibly outside of Current Scope
S12 - Cable Strain Durability Not Started Waiting on Wearable Prototype Within Current Iter Scope
S13 - Functionality/Enjoyable Not Started Waiting on Wearable Prototype Within Current Iter Scope

The current Test Plans can be found here.

Updated BOM

This is the currently up to date BOM of orders that have been made since last review in order to allow the team to explore more possibilities with the current micro controller. As can be seen, we are well within budget, so if we are able to pull things together for wearable prototypes we should be quite able to create multiple prototypes for ImagineRIT. More acquisitions will likely be made as we progress to our test plans.
Updated BOM

Updated BOM

The BOM file can be found here.

Risk and Problem Tracking

The current Risk Management chart can be found here. After several weeks,the risk of the mechanical prototype taking too long has jumped greatly which can be seen below in the Problem Tracker.

An even more serious issue was recently discovered where it appears security features may not be possible on the current micro controller, this may require a change in micro-controllers that may only be feasible for future iterations due to the time crunch.

Problem Tracking

Problem Tracking

The current solution is to reallocate the EE's without much current work to assist Willow in her duties starting with Sarah. The Problem Tracking Document can be found can be found here.

Functional Demo Materials

DEXT Demo Materials
Current Poster Draft
Review Presentation

Plans for next phase

The Team's overall Plan's for MSD II can be seen below
Project Plan Preview

Project Plan Preview

The team's individual plans for the next phase are available in the table below

Team Member 3-week Plans
Willow
Jon
Nick
Sarah
Tim
Alice
Vincent

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation