P19008: Motorized Pediatric Stander
/public/

Customer Handoff & Final Project Documentation

Table of Contents

Team Vision for Final Demo and Handoff

PLANNED:

ACCOMPLISHED:

Link to the action items for this phase: https://docs.google.com/spreadsheets/d/1f5jv7uvJhQ-PJdOt70tTB5eT9twhcVYWYGme9DRQMUY/edit#gid=625155836

Test Results Summary

Test1: Maximum Speed

Test 6: Programmable Lower Speed Limit

Test 7: Deceleration Rate

Test 8: Motor Simulation

Test 11: Battery Life

Test 13: Assembly Time

Test 14: Brand Compatibility

Test 16: Prototype Cost

Test 18: Input Algorithm

Crash test were not performed because the team ran out of time to complete testing.

Test 17: Large quantity kit manufacturing cost was not completed because the ran out of time to get a quote on manufacturing costs from a manufacturer.

Link to test plans: https://docs.google.com/spreadsheets/d/1QZrgLJdnEwTxV6RkK8rQt0_mcBnpawvVYazaes21zR0/edit#gid=501078613

Risk and Problem Tracking

Final Project Documentation

Recommendations for future work

Functional Demo Materials

Link to demo presentation: https://docs.google.com/presentation/d/1E9DusJTX417RFI_l6C016WDbT-M0KOm8B2U_kI5rTIg/edit#slide=id.p

Plans for Wrap-up


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation