P19025: Skin to Skin NICU Baby Sling
/public/

Customer Handoff & Final Project Documentation

Table of Contents

Team Vision for Final Demo and Handoff

This is the last phase of the project as a result we plan on creating the second size of garment as well as an updated version of the original size and the associated patterns and a usage brochure. The idea is to hand off a fully functional garment and all the necessary documentation for the customer to properly use them and make more of them. This phase will also include writing the final paper, creating the poster and displaying at Imagine RIT.

For this phase we were able to accomplish all of the goals set out in the vision.

Final Prototype

Final Prototype Schematic (click to view full size)

Final Prototype Schematic (click to view full size)

A. Three hook velcro strips on each side of the baby pouch provide adjustable fit and support

B. Elastic along the front edge of the garment provides upward support to the pouch

C. Loop velcro strips run the length of the upper torso for attachment of the endotracheal tube* and pouch support

D. Access for breast pumping

E. Adjustable elastic waistband to improve fit

F. Elastic straps inside the back of the garment provide support

G. Velcro on garment straps can be tightened appropriately for coverage and to secure breast pump

H. Baby pouch is lined with a soft material for the baby's comfort and can be folded down to better fit the baby

Instructions for Use

Usage Brochure Exterior (click to view full size)

Usage Brochure Exterior (click to view full size)

Usage Brochure Interior (click to view full size)

Usage Brochure Interior (click to view full size)

Manufacturing Instructions

Manufacturing instructions overview. Link to full document below (click to view full size)

Manufacturing instructions overview. Link to full document below (click to view full size)

Click here to access the full document

Test Results Summary

Final System Level Testing Results Summary (click to view full size)

Final System Level Testing Results Summary (click to view full size)

Click Here to access the full testing document

Risk and Problem Tracking

High Level Risks for Phase 8

High Level Risks for Phase 8

Click Here to access the full risk document

Final Project Documentation

Final Project Poster (click to view full size)

Final Project Poster (click to view full size)

Functional Demo Materials

Plans for Wrap-up

Schedule for Rest of the Semester

Schedule for Rest of the Semester


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation