Team Vision for Build & Test Prep Phase

For this phase of the project, our team wanted to ensure that our test plan and methods effectively addressed all of our engineering requirements agreed upon between our team and customer. This process of ensuring that our testing was appropriately in-line was crucial for beginning the semester to lead into assembly of a functional end product. Our solidified test plans were to be accompanied by drawings of our automation device. Our team has effectively developed test plans and methods that will lead to ensuring a properly functioning deliverable at the end of the semester. Our drawings have also been completed to move forward with assembly and testing of the automation device.

Test Plan Summary

The goal of our team's test plan is to develop a concise document that relates engineering requirements, test methods, and overall results and effectiveness of tests at once. Each individual test is associated with a corresponding test method as noted on the test plan. As tests are completed, this document will be updated to appropriately reflect the results of the tests.
Test Plan

Test Plan

Live Document: Test Plan

Test Methods

Risk and Problem Tracking

Since our previous design review concluding MSD I, we have had no new risk line items to be added. Any previous risk items have been updated to our problem tracking document. This document is intended to illustrate the risk encountered, why it occurred, how it was handled, and the effectiveness of how the problem was handled.
Problem Tracking

Problem Tracking

Live Document: ProblemTracking
 Risk Management

Risk Management

Live Document: Risk Management

Automation Drawings

 Automated Cell Passaging System

Automated Cell Passaging System

 Automated Cell Passaging System

Automated Cell Passaging System

 Extruded Aluminum Beam Black Anodize

Extruded Aluminum Beam Black Anodize

 Extruded Aluminum Cross Section Frame

Extruded Aluminum Cross Section Frame

 Frame Bracket

Frame Bracket

 Guide Rod and Lead Screw

Guide Rod and Lead Screw

MSD II WBS

 Work Breakdown Structure MSD 2

Work Breakdown Structure MSD 2

Work Breakdown Structure MSD 2

Work Breakdown Structure MSD 2

Live Document: WBS

Plans for next phase

Our team's goal for the next three weeks in preparation of our next review will be to have obtained all microscope images (hemocytometer and petri dish) for growth curve testing to obtain the doubling time for the 3T3. We also plan on having assembled our first run of the automation device to begin automation testing.

Tony Yosick's Three Week Plan Live Document: Tony's Three Week Plan

Philip Tinder's Three Week Plan Live Document: Philip's Three Week Plan

Christa Vuglar's Three Week Plan Live Document: Christa's Three Week Plan

Charles Henle's Three Week Plan Live Document: Charles' Three Week Plan

Emma Kate Flanagan's Three Week Plan Live Document: Emma Kate's Three Week Plan


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation