Build & Test Prep

Table of Contents

Team Vision for Build & Test Prep Phase

In this short phase, the goal is to meet back up with the team after a long break and make sure that we are ready to start building and testing everything we have designed thus far. The main tasks to be completed are ordering all materials to build the structures and PCBs that will make up the subsystem.

We also made a problem tracking document that we will use as we being to test out our hardware and find mistakes that could be improved upon.

As we move forward, we will continue to minimize risk, and keep track of our budget to make sure we have enough at the end to launch.

DACQ/CBOB Build & Test Prep

The block diagram for the Data Acquisition Board (DACQ) is shown below.

DACQ

DACQ

The block diagram for the Cluster Breakout Board (CBOB) is shown below.

DACQ

DACQ

The DACQ and CBOB Build & Test Prep page goes through the detailed design of the DACQ and CBOB.

BioCell Build & Test Prep

A CAD Cross-Section of the BioCell is shown below.

BioCell

BioCell

The BioCell Build & Test Prep page goes through the detailed design of the Biocell.

Communication System Build & Test Prep

The data transfer of the communication is shown below.

Communication Board Data Block Diagram

Communication Board Data Block Diagram

The Communication System Build & Test Prep page goes through the detailed design of the communication system.

Power Build & Test Prep

The 3D model of the Power Management Board is shown below.

PMB 3D Model Top

PMB 3D Model Top

PMB 3D Model Bottom

PMB 3D Model Bottom

The Power Build & Test Prep page goes through the build plan and test plan of the system.

Structure Build & Test Prep

The functional decomposition of the structure is shown below.

Platform and BioCell Layout

Platform and BioCell Layout

Platform and BioCell Layout

Platform and BioCell Layout

The Structure Build & Test Prep page goes through the Detailed Design of the structure.

Test Plan Summary

Our test plans are contained in the following document: Test Plans

Risk and Problem Tracking

A link to the Problem Tracking document can be found here: Problem Tracking

An updated Risk Document can be found here: Risk Document

Bill of Material (BOM) and Budget

The actual budget of the team to data is shown below:

Actual Budget

Actual Budget

The purchases we have made so far are shown in the table below:

Purchases Made So Far

Purchases Made So Far

The budget of the team that contains actual and projected purchases is shown below.

SF1 Projcted Budget

SF1 Projcted Budget

The category "Other" is set aside for any unforseen costs going forward, and has been allocated to be ~20% of our total budget.

A portion of the high level BOM that contains most of the parts from the various subsystems is shown below.

SF1 System BOM

SF1 System BOM

A link to the working document can be found here: Master Board BOM for Presentation.xlsx

SF1 Budget

SF1 Budget

SF1 Part Cost Breakdown

SF1 Part Cost Breakdown

Plans for next phase

Demo by end of next phase

By the end of the Subsystem Build & Test Phase, we would like to demonstrate to our customer the following things working:

Comms

Structure

Power

DACQ

CBOB

BioCell

Notes From Our Review

Notes for the Build and Test Prep Phase

Schedule for Next Phase

A link to our schedule for the next phase is here:

Build and Test Prep Documents/Schedule_for_Sub_build_test.pdf

Three-week plans for individual team members:

Member Three-Week Plan
Braeden Morrison 3_week_plans/Subsystem_Build_&_Test/BJM_3_Week_Plan_for_Subsystem_Build_&_Test.docx
Larissa Plaskon 3_week_plans/Subsystem_Build_&_Test/LFP_3_Week_Plan_for_Subsystem_Build_&_Test.docx
Jacob Felice 3_week_plans/Subsystem_Build_&_Test/JTF_3_Week_Plan_for_Subsystem_Build_&_Test.docx
Andrew Eberhard 3_week_plans/Subsystem_Build_&_Test/AJE_3_Week_Plan_for_Subsystem_Build_&_Test.docx
Joe Payne 3_week_plans/Subsystem_Build_&_Test/JDP_3_Week_Plan_for_Subsystem_Build_&_Test.docx
Ryan Tatu 3_week_plans/Subsystem_Build_&_Test/RNT_3_Week_Plan_for_Subsystem_Build_&_Test.docx
Ben Cooper 3_week_plans/Subsystem_Build_&_Test/BEC_3_Week_Plan_for_Subsystem_Build_&_Test.docx

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation