Vision for Build & Test Prep Phase

All parts of the Communication System that have been designed in MSD are to be assembled and tested in the upcoming months before the launch up to 100,000ft. The Communication must be rugged enough to keep in contact with the ground and relay its position to the APRS network.

Board Files

The Communication board layout was finalized between the end of MSD I and the first week of MSD II.

The gerbers that were used to generate the board as well as the final board and schematic files are here:

Zipped_Gerbers

CAD File of board

CAD File of board

CAD of Board

Board File

Schematic File

All Layers of the PCB

All Layers of the PCB

Bottom Layer of the PCB

Bottom Layer of the PCB

Top Layer of the PCB

Top Layer of the PCB

Test Plan Summary

In the upcoming weeks, the main focus will be getting the communication board working on its own, and getting it ready to be integrated with the rest of the system. Because many of the subsystems are modeled after work done 2 years ago in P17104, much of the risk of the PCB has been minimized.

Below are the tests for the communication board's power and sensor circuitry, as well as tests for the APRS.

Test Plan For Communication Board

The steps that will be used to test out the communication board are as follows:

Board Power Test

Board Power Test

Board Power Test

Board Signals Test

Board Signals Test

Board Signals Test

Other Communication System Tests

The APRS will also be tested in the next phase:

APRS Test

APRS Test

APRS Test

Risk and Problem Tracking

The main things still to be done for this phase are finalizing the design for the GRSS enable and Balloon cutdown enable. There are GPIOs on the Comm board that have been put to serve as a switch control.

A link to the Problem Tracking document can be found here:

Problem Tracking

An updated Risk Document can be found here:

Risk Document

Plans for the 6 Week Demo


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation