Vision for Build & Test Prep Phase

The CBOB and DACQ will arriving soon and can be populated. The past two weeks have been spent preparing for assembling and testing these two boards. The reaction wheel has also been tested and works properly. The control loop has not yet been implemented, but will be based heavily off of last years loop.

Final Board Ordered

Small modifications to the PCB were made over winter break before ordering. The new layers can be seen below.

DACQ

All Layers of the DACQ

All Layers of the DACQ

Top Layer of the DACQ

Top Layer of the DACQ

Bottom Layer of the DACQ

Bottom Layer of the DACQ

CBOB

All Layers of the CBOB

All Layers of the CBOB

Top Layer of the CBOB

Top Layer of the CBOB

Inner Layer 1 of the CBOB

Inner Layer 1 of the CBOB

Inner Layer 2 of the CBOB

Inner Layer 2 of the CBOB

Bottom Layer of the CBOB

Bottom Layer of the CBOB

Test Plan Summary

The working document for test plans of all boards in this project can be found here:

Test Plans

Test Plans For DACQ

DACQ General Test Plan

DACQ General Test Plan

DACQ Power Test Plan

DACQ Power Test Plan

DACQ Data Test Plan

DACQ Data Test Plan

DACQ Control Loop Test Plan

DACQ Control Loop Test Plan

Test Plans for CBOB

CBOB General Test Plan

CBOB General Test Plan

CBOB Power Test Plan

CBOB Power Test Plan

CBOB Data Test Plan

CBOB Data Test Plan

Risk and Problem Tracking

There is a lot to be done in the next phase in terms of software development that coincides with debugging the boards. The limited time, along with the fact that I'm one guy who's pretty busy, poses a risk moving forward in completing the necessary tasks to a certain quality.

A link to the Problem Tracking document can be found here:

Problem Tracking

An updated Risk Document can be found here:

Risk Document

Plans for the 6 Week Demo

DACQ

CBOB


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation