Vision for DACQ and CBOB Subsystem Level Build & Test Phase

Boards have been delivered, populated, and preliminary testing has taken place along with initial software. At this point, everything needed has been delivered, should be no more ordering.

Test Results Summary

Running Document Tests: There are still many tests to be updated and done. As systems are developed they are tested. Power has been tested and works properly.

Phase Successes

Assembled Boards

DACQ Front

DACQ Front

DACQ Back

DACQ Back

CBOB Front

CBOB Front

CBOB Back

CBOB Back

Some Sweet Pics

Buck Converters for BioCells

Buck Converters for BioCells

XRAY of Buck Converter Above

XRAY of Buck Converter Above

DACQ Power Testing

DACQ Power Testing

Testing MEMS Mic on DACQ

Testing MEMS Mic on DACQ

DACQ and PMB Communicating Over SPI

DACQ and PMB Communicating Over SPI

Ripple on Buck Converters

All plots are under no load conditions
DACQ 12V to 5V Buck

DACQ 12V to 5V Buck

CBOB 12V to 3.3V Buck 1

CBOB 12V to 3.3V Buck 1

CBOB 12V to 3.3V Buck 2

CBOB 12V to 3.3V Buck 2

CBOB 12V to 3.3V Buck 3

CBOB 12V to 3.3V Buck 3

CBOB 12V to 3.3V Buck 4

CBOB 12V to 3.3V Buck 4

Risk and Problem Tracking

A link to the Problem Tracking document can be found here: Problem Tracking

An updated Risk Document can be found here: Risk Document

Plans for next phase


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation