P19104: HABIP-BioX
/public/

Detailed Design

Table of Contents

Team Vision for Detailed Design Phase

Detailed block diagrams of each sub system were created. Analysis and prototyping were performed where necessary to gain insight on the best solution. The team worked on completing schematics for all of the boards in the system.

DACQ/CBOB Detailed Design

The block diagram for the Data Acquisition Board (DACQ) is shown below.

DACQ

DACQ

The block diagram for the Cluster Breakout Board (CBOB) is shown below.

DACQ

DACQ

The DACQ and CBOB Detailed Design page goes through the detailed design of the DACQ and CBOB.

BioCell Detailed Design

A CAD Cross-Section of the BioCell is shown below.

BioCell

BioCell

The BioCell Detailed Design page goes through the detailed design of the Biocell.

Communication Detailed Design

The data transfer of the communication is shown below.

Communication Board Data Block Diagram

Communication Board Data Block Diagram

The Communication System Detailed Design page goes through the detailed design of the communication system.

Power Detailed Design

A block diagram of the power system is shown below.

Power System Block Diagram Block Diagram

Power System Block Diagram Block Diagram

The Power Detailed Design page goes through the detailed design of the system.

Structure Detailed Design

The functional decomposition of the structure is shown below.

Platform Design with Preliminary Layout

Platform Design with Preliminary Layout

The Structure Detailed Design page goes through the Detailed Design of the structure.

Software Detailed Design

The Software Detailed Design page goes through the Detailed Design of the Software.

Bill of Material (BOM)

The budget we breakdown of the team that we are sticking to going forward is shown below:

SF1 System BOM

SF1 System BOM

The category "Other" is set aside for any unforseen costs going forward, and has been allocated to be ~20% of our total budget.

A portion of the high level BOM that contains most of the parts from the various subsystems is shown below.

SF1 System BOM

SF1 System BOM

A link to the working document can be found here: Master Board BOM for Presentation.xlsx

SF1 Budget

SF1 Budget

SF1 Part Cost Breakdown

SF1 Part Cost Breakdown

Test Plans

The testplans that were created last phase were expanded upon for this phase. A document listing the test plans that will address all of the engineering requirements of the entire system can be found here. Test Plans

Design and Flowcharts

A block diagram of the entire system is shown below.

Power Distribution

Board Diagram

Board Diagram

Data Connections

Board Diagram

Board Diagram

Risk Assessment

For the most part, there were no new risks identified for the project. The main thing we are keeping in mind going forward is making sure there is enough time set aside to writing and debugging the software.

A link to the full document containing the risks identified in all project phases can be found here:

Risk Document

Plans for next phase

We will test out fabricated boards. And get the hardware of the whole system working. Then, we will get the software working for the system.

Schedule

A Gantt chart describing the schedule for the next phase of MSDI is included here: SF1 Schedule

Three-week plans for individual team members:

Member Three-Week Plan
Braeden Morrison 3_week_plans/Build_&_Test_Prep/BJM_3_Week_Plan_for_Build_&_Test_Prep.docx
Larissa Plaskon 3_week_plans/Build_&_Test_Prep/LFP_3_Week_Plan_for_Build_&_Test_Prep.docx
Jacob Felice 3_week_plans/Build_&_Test_Prep/JTF_3_Week_Plan_for_Build_&_Test_Prep.docx
Andrew Eberhard 3_week_plans/Build_&_Test_Prep/AJE_3_Week_Plan_for_Build_&_Test_Prep.docx
Joe Payne 3_week_plans/Build_&_Test_Prep/JDP_3_Week_Plan_for_Build_&_Test_Prep.docx
Ryan Tatu 3_week_plans/Build_&_Test_Prep/RNT_3_Week_Plan_for_Build_&_Test_Prep.docx
Ben Cooper 3_week_plans/Build_&_Test_Prep/BEC_3_Week_Plan_for_Build_&_Test_Prep.docx

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation