Subsystem Build & Test

Table of Contents

Team Vision for Subsystem Level Build & Test Phase

SF1! Logo that contains over 30 PCBs

SF1! Logo that contains over 30 PCBs

DACQ/CBOB Subsystem Build & Test

The assembled DACQ is shown below.

DACQ

DACQ

The assembled CBOB is shown below.

CBOB

CBOB

The DACQ and CBOB Subsystem Build & Test page goes through what was done in this phase for the DACQ and CBOB.

BioCell Subsystem Build & Test

A CAD Cross-Section of the BioCell is shown below.

BioCell

BioCell

The BioCell Subsystem Build & Test page goes through the detailed design of the Biocell.

Communication System Subsystem Build & Test

The data transfer of the communication is shown below.

Communication System Hardware

Communication System Hardware

The Communication System Subsystem Build & Test page goes through the detailed design of the communication system.

Power Subsystem Build & Test

The assembled Power Management Board PCB is shown below.

PMB PCB Front

PMB PCB Front

The Power Subsystem Build & Test page goes through the build plan and test plan of the system.

Structure Subsystem Build & Test

The top level structure assembly is shown below.

Platform and BioCell Layout

Platform and BioCell Layout

The Structure Subsystem Build & Test page goes through the detailed design of the structure.

Test Results Summary

Our test plans are contained in the following document: Entire System Test Plans

Updated test plans for the power subsystem are linked: Power Test Plans

Risk and Problem Tracking

A link to the Problem Tracking document can be found here: Problem Tracking

An updated Risk Document can be found here: Risk Document

Functional Demo Materials

Comms

Structure

Power

DACQ & CBOB

BioCell

Bill of Material (BOM) and Budget

The actual budget of the team to data is shown below:

Actual Budget

Actual Budget

The purchases we have made so far are shown in the table below:

Purchases Made So Far

Purchases Made So Far

The budget of the team that contains actual and projected purchases is shown below.

SF1 Projcted Budget

SF1 Projcted Budget

The category "Other" is set aside for any unforeseen costs going forward, and has been allocated to be ~20% of our total budget.

A portion of the high level BOM that contains most of the parts from the various subsystems is shown below.

SF1 System BOM

SF1 System BOM

A link to the working document can be found here: Master Board BOM for Presentation.xlsx

SF1 Budget

SF1 Budget

SF1 Part Cost Breakdown

SF1 Part Cost Breakdown

Plans for next phase

Demo by end of next phase

By the end of the Subsystem Build & Test Phase, we would like to demonstrate to our customer the following things working:

Comms

Structure

Power

DACQ

CBOB

BioCell

Schedule for Next Phase

A link to our schedule for the next phase is here:

Subsystem Build & Test Documents/Schedule_fot_Integrated_Build_&_Test.pdf

Three-week plans for individual team members:

Member Three-Week Plan
Braeden Morrison 3_week_plans/Integrated_System_Build_&_Test/BJM_3_Week_Plan_for_Integrated_System_Build_&_Test.docx
Larissa Plaskon 3_week_plans/Integrated_System_Build_&_Test/LFP_3_Week_Plan_for_Integrated_System_Build_&_Test.docx
Jacob Felice 3_week_plans/Integrated_System_Build_&_Test/JTF_3_Week_Plan_for_Integrated_System_Build_&_Test.docx
Andrew Eberhard 3_week_plans/Integrated_System_Build_&_Test/AJE_3_Week_Plan_for_Integrated_System_Build_&_Test.docx
Joe Payne 3_week_plans/Integrated_System_Build_&_Test/JDP_3_Week_Plan_for_Integrated_System_Build_&_Test.docx
Ryan Tatu 3_week_plans/Integrated_System_Build_&_Test/RNT_3_Week_Plan_for_Integrated_System_Build_&_Test.docx
Ben Cooper 3_week_plans/Integrated_System_Build_&_Test/BEC_3_Week_Plan_for_Integrated_System_Build_&_Test.docx

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation