Team Vision for Preliminary Detailed Design Phase

During this phase phase, the plan is simply to test the components intended for use in the design to ensure that they will suit our needs. Completing this task will allow for a comfortable greenlighting of the current design plans and schematics.

Feasibility Testing & Simulations

Shown Below are a set of HDPE Calculations performed for this project.
 HDPE

HDPE

 HDPE

HDPE

 HDPE

HDPE

 HDPE

HDPE

 HDPE

HDPE

 HDPE

HDPE

 HDPE

HDPE

 HDPE

HDPE

Test Plans

Mechanical

Electrical

Computer

Design and Flowcharts

Top Level Structure of Product

Top Level Structure of Product

Flowchart of Main Driver

Flowchart of Main Driver

Functional Decomposition of Firmware

Functional Decomposition of Firmware

Risk Assessment

The gimbal will need to be prototyped before we can definitively conclude how we intend to handle coil cabling, rotation limit switches or weatherproofing.

We need to find a way to perform thermal and environment testing on the assembly to determine its temperature and humidity tolerance. During this process and in choosing our components, we need to be well aware of the individual temperature ratings of our parts. As it stands, we may have found a suitable option for this set of testing.

Design Review Materials

Presentation Pre-Read

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation