Table of Contents

Your website should document your journey through MSD, so include work-in-progress as well as latest results. Use pdf's for display whenever possible so that information is easily viewable without the need to download files and open applications. (Your EDGE file repository should still contain original editable files).

All template text must be removed prior to your Final Demo and Handoff

Team Vision for Final Demo and Handoff

Summarize:

Test Results Summary

Tests Performed.

Tests Performed.

Ringing Detection.

Ringing Detection.

Off-hook Detection.

Off-hook Detection.

Ring wire current through a 1k resistor.

Ring wire current through a 1k resistor.

M1 Gate terminal voltage.

M1 Gate terminal voltage.

Ringing signal voltage.

Ringing signal voltage.

Line Simulator LED state when Interface board Pick-up

Line Simulator LED state when Interface board Pick-up "Switch" is Open.

Line Simulator LED state when Interface board Pick-up

Line Simulator LED state when Interface board Pick-up "Switch" is Closed.





Inputs & Source

  1. Test Plan
  2. Results of system integration

Outputs & Destination

  1. Test Results
  2. Final documentation: paper, poster, manuals

Risk and Problem Tracking

Risk Management.

Risk Management.

Final Project Documentation

Interface Board Schematics.

Interface Board Schematics.

Interface Board Parts list.

Interface Board Parts list.

Assembly of anker and line simulator holder pieces

Assembly of anker and line simulator holder pieces

Functional Demo Materials

Include links to:

Plans for Wrap-up

Alex:



Dania:



Zhengguo:



Elijah:



Grace:






Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation