Build & Test Prep

Table of Contents

Team Vision for Build & Test Prep Phase

Phase Summary

As a team, our plan for this phase was to review what we accomplished in MSD I and begin to create steps to execute our plans in MSD II. This included summarizing the tests we will be conducting on both the electrical & mechanical sides, as well as re-evaluating our risks in order to minimize problems throughout the semester.

On the mechanical side, we have proceeded to laser cut a prototype chassis and are beginning to test the fit with the rest of our 3D printed mechanical parts.

On the electrical side, we have finished PCB development and have placed our first run order so that we can begin testing it's functionality and compatibility once it is delivered.

In general, we have ordered the majority of the parts we need for our test plans and are doing well in terms of budget and timeline.

Phase 5 Plan

Phase 5 Plan

Test Plan Summary

Test Plans (Completed)

Test Plans (Completed)

Test Plans (Need to Complete)

Test Plans (Need to Complete)

Updated Project Budget & BOM

Updated Prototype Budget Log

Updated Prototype Budget Log

Updated Bill of Materials

Updated Bill of Materials

Risk and Problem Tracking

Updated Risks

Updated Risks

Plans for next phase

As a team, by next review we hope to have solid prototype models on both the mechanical & electrical sides of the team, so that we can begin to integrate our subsystems in phase 7 and hopefully have a working car to test.
Phase 6 Plan

Phase 6 Plan

Cam:

Safwan:

Fatma

Jack

Brian


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation