What did we plan to do:

  1. Weld stage frame
  2. Cut and assemble sandwich platforms
  3. Cut and weld stage legs
  4. Prepare testing setup

What did we actually do:

  1. Welded stage frame
  2. Prepared sandwich materials for assembly
  3. Cut and prepared leg assembly for welding
  4. Submitted requests for rest of materials

Pictures of Build and Assembly so far

Milled leg assembly mating slots

Milled leg assembly mating slots

Frame welding setup

Frame welding setup

Frame welding setup

Frame welding setup

Welded Side Stage Frame

Welded Side Stage Frame

Welded frame inspection

Welded frame inspection

Center Stage Layout

Center Stage Layout

Preparing cuts for sandwich layers

Preparing cuts for sandwich layers

Sample of sandwich with adhesive

Sample of sandwich with adhesive

Risk and Problem Tracking

View live Risk Management document here.

View live Problem Tracking document here.

Functional Demo Materials

Presentation link here

Design Review is scheduled for March 28th, 2019. Notes will be uploaded here soon after.

Plans for next phase

During the next phase, The MUSIC team will:

Jason Schulz

Eric Szyjka


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation