Throughout the problem definition phase, the MUSIC team has worked to successfully identify:

Project Summary

A stage can be the center piece of any performance and focuses the audience's attention on the performer. Rochester NY is quickly becoming one of the great music capitals of the country, attracting artists and musicians from all over to perform there. The Rochester Music Hall of Fame has recently acquired a small venue with plans to hold many future events and performances. The need for a stage is in confliction with the small amount of available floor space. The Rochester Music Hall of Fame has identified the opportunity to contstruct a stage with the ability to be stowed against a wall, out of sight to save floor space, the Murphy Stage.

A project summary can be viewed here: Murphy Stage Project Summary

Use Cases

Potential stakeholders for the project include but are not limited to:

Project Goals and Key Deliverables

The primary goal of this project is to develop a stowable stage for the purpose of maximizing useable floor space when the stage is not needed.

Deliverables:

Customer Requirements (Needs)

View the live customer requirements document here.

Engineering Requirements (Metrics & Specifications)

View the live engineering requirements document here.

Constraints

Constraints include but may not be limited to:

House of Quality

A link to the live House of Quality document can be found here.

Design Review Materials

The Problem Definition Review is scheduled for 9/13/2018, at 11:00 AM. The presentation slides can be found here.

Plans for next phase

The following items are what we plan to accomplish during the next 3 week phase (Weeks 4-7)
  1. Functional decomposition
  2. Benchmarking
  3. Analysis, prototyping, and/or benchmarking of critical technology
  4. Concept generation
  5. Concept Selection
  6. Systems architecture
  7. Refined Risk Assessment
  8. First cut of test plan
  9. Systems Design review with customer and guide

Link to individual 3 week plan:

Vincent D'Arrigo

Jason Schulz

Kevin Leonard

Eric Szyjka


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation