P19510: Eastman Museum Digitization Process
/public/

Problem Definition

Table of Contents

Team Vision for Problem Definition Phase

The problem definition phase of the project consisted of learning about the current problem with digitization at the George Eastman House in Rochester, NY. The plan for this phase was to familiarize ourselves with the current process and review the customer expectations. To accomplish this plan, we visited the Eastman House and spent time observing the process and all of the subsystems currently in place. The customer expectations were better understood by reading the project readiness package and the other supplemental reading our customer sent us (i.e. FADGI requirements).

Project Summary

The George Eastman Museum's 2D artifact digitization process is currently an almost entirely manual one and is very labor intensive and time consuming. The museum photographer must manually calibrate the lighting to account for camera height, position the artifact carefully and capture one or more images of it while verifying the quality of the images and cleaning away dust every few images.

Ideally, this digitization process would have many of its key steps be automated, greatly reducing the time taken to digitize an object and reducing strain on the operator. This automation would function in such a way as to ensure the safety of both the artifact being imaged and the operator of the system.

The goals of this project are to analyze the current digitization process and to identify and address major points of improvement. These issues will be addressed in such a way as to be compliant to OSHA standards and intellectual property licenses and allow for the ability to upgrade the current equiment and to meet the FADGI 4-star requirements.

Use Cases

Project Goals and Key Deliverables

Customer Requirements (Needs)

Customer Requirements

Customer Requirements

See this live document for up to date customer requirements.

Engineering Requirements (Metrics & Specifications)

Engineering Requirements

Engineering Requirements

See this live document for up to date engineering requirements.

Constraints

House of Quality

See this live document for the up to date P19510 house of quality.

Design Review Materials

Plans for next phase

During the Systems Design Phase, Team 19510 hopes to successfully accomplish the following tasks:
  1. Define FADGI requirements necessary for a 4-star rating
  2. Benchmarking: Research other 4-star FADGI processes
  3. Understand how to measure the FADGI requirements
  4. Understand Capture 1 basics
  5. Concept Development
    • Overall bench design

Detailed 3 week plans for each team member can be found in this directory


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation