P19571: Solar Spectrograph
/public/

Preliminary Detailed Design

Table of Contents

Team Vision for Preliminary Detailed Design Phase

Plan for this phase is to keep building upon the design review and come up with more detailed schematics, different feasibility if the approach is different alongside the flowcharts and updated Bill of materials which was achieved.

Feasibility: Prototyping, Analysis, Simulation

Feasibility - Run Integrated System

Single Parent Software vs Individual Control Systems:

Multiple Related Software:

Feasibility - Wake up/Go to sleep

Read data from an online weather service:

Feasibility - GUI

Modify and improve the current LabView GUI:

Build web based application:

Feasibility - Error Monitoring

MSP430:

LED Detection on Security Camera:

Feasibility - Weather Protection

Read wind speed from the sensor - Most accurate, instant reading allowing dish to immediately go into a safety position

Snow - Not so straight forward. Read data from online weather service to prepare dish for upcoming storms

Feasibility - Interference Reduction

Feasibility - Storage

500 GB SSD

Assume up to 200 MB per day with various other files

Drawing of POST at observatory

 Post at observatory

Post at observatory

 Post Measurements

Post Measurements

Sofware

 Overall Psuedocode

Overall Psuedocode

Status Light

Bill of Material (BOM)

 Budget - Overview for ASRAS

Budget - Overview for ASRAS

 Post BOM

Post BOM

RF Testing

 Lab Test

Lab Test

 Lab Test in Faraday Cage

Lab Test in Faraday Cage

 Lab Test in Faraday Cage

Lab Test in Faraday Cage

 Dipole Isolation Lab Test

Dipole Isolation Lab Test

Risk Assessment

 Risk Assessment

Risk Assessment

Design Review Materials

Plans for next phase


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation