Your website should document your journey through MSD, so include work-in-progress as well as latest results. Use pdf's for display whenever possible so that information is easily viewable without the need to download files and open applications. (Your EDGE file repository should still contain original editable files).

All template text must be removed prior to your Integrated System-Level Build & Test Review

Team Vision for Integrated System Build & Test Phase

We were able to make some more progress on our program. The code now automatically outputs a video file (.avi or .mov) with the exit velocity metric and the option to input the batter's name to the video as well. We planned on the video file also having the launch angle metric, but with the semester coming to a close, many other deadlines slowed our progress down. This is a great accomplishment for our project, and we are very proud of the work we were able to finish, especially given the circumstances.

Test Results Summary

We were able to get our program to output a relatively accurate exit velocity metric. This is a huge accomplishment for us considering the hectic circumstances of this semester. The end result of this project will not meet all of the design requirements, but we came very close despite all of the Covid-19 related issues.

Risk and Problem Tracking

Our risks and problems have not really changed since they were drastically altered during spring break.

Plans for next phase

We are preparing our final project documentation and performing our final design review with RIT Baseball over the next week.

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation