Your website should document your journey through MSD, so include work-in-progress as well as latest results. Use pdf's for display whenever possible so that information is easily viewable without the need to download files and open applications. (Your EDGE file repository should still contain original editable files).

Due to the Covid-19 situation, RIT's campus is shut down and all RIT classes have moved to online formats. We will be finishing what we can for MSD P20071 and preparing for hand off to an individualized study group or next year's MSD program.

Team Vision for Subsystem Level Build & Test Phase

Our team is going to update all of our relevant documents based on the changed circumstances of this semester. We will update our test plan to reflect what we have already done, what is left that we can still do, and what we can no longer do.

The plan moving forward is to prepare our project for "hand-off" to a new group next year.

Test Results Summary

We were only able to complete the first stage, radar based exit velocity, of our test plan. Our videos correspond to the following spreadsheet and its data. We will keep working on our code to output exit velocity and launch angle metrics. These are the only metrics we will be able to show based on our limited amount of videos and lack of access to our benchmark products for more testing.

One factor we considered but were not able to control is the horizontal exit direction of the batted ball. We recorded the range of exit directions during our video session, but did not record this metric for individual videos. We will use the range of exit directions to estimate a range of exit velocities or a range of acceptable error for each batted ball.

Risk and Problem Tracking

Our risks and problems also changed pretty significantly since spring break. We updated our tracking list to reflect these new obstacles.

Functional Demo Materials

Plans for next phase


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation