P20414: Indoor Dry Toilet Base
/public/

Customer Handoff & Final Project Documentation

Table of Contents

Team Vision for Final Demo and Handoff

The team planned on finishing up final deliverables such as the paper, the poster and the lightning talk. This is in addition to wrapping up the project by making all documentation available to a future team.

The team was able to accomplish exactly what we planned on doing due to the reduced scope of the project after prototyping was cancelled.

Final Project Documentation

PDF of Final Paper

PDF of Final Poster

Below is a detailed guide explaining how to assemble the outer and inner mold and how to start manufacturing the toilet base.

Molds Assembly Guide

Below is the Bill of Materials showcasing what materials are needed to create the toilet

Bill Of Materials

Design vs Requirements PDF

Design vs Requirements EXCEL File

Considerations For Future Teams

Final Design

Outer Mold Exploded View

Outer Mold Exploded View

Inner Mold Exploded View

Inner Mold Exploded View

Outer and Inner Mold Assembled

Outer and Inner Mold Assembled

Full Sized Outcome After Pouring Concrete

Full Sized Outcome After Pouring Concrete

Diverter Re-design

Diverter Re-design

Final Outcome After Attaching The Diverter

Final Outcome After Attaching The Diverter

Engineering Drawings

Layers 1,2,8,9

Layers 3-7

Layer 10

Layer 11

Layer 12

Layer 13

Layer 14

Layer 15

Layer 16

Layer 17

Layer 18

Layer 19

Layer 20

Layer 21

Layer 22

Layer 23

Layer 24

Layer 1-9

Layer 10

Layer 11

Layer 12

Layer 13

Layer 14

Layer 15

Layer 16

Layer 17

Layer 18

Layer 19

Layer 20

Layer 21

Layer 22

Layer 23

Layer 24

Human Subject Forms

Human Subject Abstract

Informed Consent

Human Subject Testing Protocol

HSRO Info

Form F

Human Subject Testing

Toilet User Survey

This is a compiled list of documentation that a team will be required to fill out / submit if they wish to perform testing for the product. Additionally, the tester will have to obtain certification which are listed in the "HSRO Info" Document. Within that document one will find a message from the Human Subject Research Office that describes in detail the requirements to complete a study such as the one that we proposed before the project was cut short.

Plans for Wrap-up

To wrap up the project, the team will simply make sure that all documentation is accessible to the next team to ensure a smooth transition of all information. This includes all drawings, potential risks the next team might encounter, and Human Subjects testing documentation. All of this information will either be available on the cloud (fusion) or within our edge page which will be easy to reference for another group.

Team 3-Week Plan

Also attached below are timelines and plans for how long it would have taken to complete the mold.

Timeline to Create Base PDF

Estimation of Times

Timeline in Microsoft Project


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation