Integrated System Build & Test

Table of Contents

Team Vision for Integrated System Build & Test Phase

The team planned on finishing construction of the rotating table subsystem and the mechanical arm subsystem so that they could test these systems individually to work out any issues and then work on integrating these systems. Due to the Covid-19 outbreak and the subsequent cancellation of in-person classes at RIT this was put on hold. The team instead focused on updating prior design documentation and creating more documentation with the aim of passing this off to a follow-on MSD team to complete the design.

Test Results Summary

Only preliminary tests were carried out prior to class cancellation. Due to this, the team has no formal test results to report.

Risk and Problem Tracking

Functional Demo Materials

The review for this phase can be found here.

Plans for next phase

Documents

Subsystem Build & Test Documents

A directory consisting a snapshot of all of our live documents as of this phase can be found here (files) and here (photo gallery).

Final Documents

A directory consisting a snapshot of all of our live documents as of this phase can be found here (files) and here (photo gallery).


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation