P20762: Agriculture Through Aquaponics
/public/

Subsystem Build & Test

Table of Contents

Team Vision for Subsystem Level Build & Test Phase

The objective of subsystem testing is to carry out our subsystem test plans. These plans outline the sensor, structure, flow rate, nitrate cycling, user interface, and filtering capabilities of our system. Accurate documentation will be updated in our test plans. The subsystem testing is integral to driving our vision for full system testing. Adjustments will be made to the plans after proper identification and discussion of new issues. Deliverables including the technical paper, poster, setup manual, and user guide will be updated as needed.

Three Week Plans

Peer Reviews From Build & Test Prep Phase

Peer Reviews For this Phase

Test Results Summary

public/SubsystemBuild&Test/tp1.png
public/SubsystemBuild&Test/tp2.png
public/SubsystemBuild&Test/tp4.png
public/SubsystemBuild&Test/tp5.png
public/SubsystemBuild&Test/tp6.png

Updated test plan doc

Risk and Problem Tracking

Functional Demo Materials

Plans for next phase


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation